More gas to Hammerfest LNG: Askeladd on stream

Phase 1 of Askeladd will bring 18 billion cubic metres of gas and two million cubic metres of condensate to the market via the Hammerfest LNG plant on Melkøya.
Askeladd is a satellite field of the Snøhvit Field and developed as a subsea tie-in to the Snøhvit facility and Hammerfest LNG.

"Askeladd is now producing, the gas will help extend plateau production from Hammerfest LNG on Melkøya up tothree years," says Thor Johan Haave, Equinor’s vice president operations & maintenance, Hammerfest LNG.
During normal production, Hammerfest LNG (HLNG) delivers 18.4 million standard cubic metres of gas per day, or 6.5 billion cubic metres per year. This corresponds to the needs of around 6.5 million European households, or 5% of all Norwegian gas exports.
"HLNG delivers significant volumes to customers in Europe, and the gas from the Barents Sea reinforces our position as a predictable and reliable gas supplier. Askeladd and other projects in the region will ensure further value creation and production from HLNG for decades,” Haave adds.

The project was originally completed in 2020, but start-up had to wait until the Melkøya plant resumed operations after the fire the same year. The development was delivered on schedule and NOK 650 million below the cost estimate of NOK 5.2 billion.
"Just over 1.5 million person-hours of work have gone into the project, most of them performed by our suppliers. During the project period, Askeladd generated 250–300 person-years of work in Northern Norway, mainly in Hammerfest. In addition, many employees and suppliers have helped restart Hammerfest LNG, which makes it possible to phase in both Askeladd and future projects," says Trond Bokn, Equinor's senior vice president for project development.
Askeladd is the first of several projects in the further development of the Snøhvit field and the infrastructure around HLNG. Next up is Askeladd West with two new wells tied back to existing infrastructure, before further development continues with onshore compression and electrification through the Snøhvit Future project.

Latest news

Equinor captures value through sale of Argentina onshore assets
Equinor has signed an agreement with Vista Energy to divest its full onshore position in Argentina’s Vaca Muerta basin. The transaction includes Equinor’s 30% non-operated interest in the Bandurria Sur asset and its 50% non-operated interest in the Bajo del Toro asset. Equinor’s Argentinian offshore acreage is not affected by the transaction.

Billion-NOK contract for helicopter transportation and emergency preparedness in the Barents Sea
Equinor and Vår Energi have awarded Bristow a new, long-term contract for helicopter transportation and search and rescue (SAR) services from the base in Hammerfest. The contract ensures stable and predictable services at a time of increased activity in the Barents Sea.

Equinor’s 2025 safety results
The accident at Equinor's refinery at Mongstad in September, where a colleague lost his life during a lifting operation, has had a major impact on the company.